One binary: the lint and the trainer are commands of portal
Test / test (pull_request) Successful in 1m7s
Test / test (pull_request) Successful in 1m7s
portal serve runs a site; portal lint is what iris was; portal plan, build, report and the rest are what portal-trainer was. One source at one version, so the three never disagree about what content means. Both histories are merged in (subtree). The release attaches the bare binary for a content repo's CI. The trainer's plans, intakes, engines and reference prompt come along; its runs stay in the old repo. Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01GT37Z1Xtfd9pUuQtMTg6Yt
This commit is contained in:
co-authored by
Claude Fable 5.1
parent
d0d1cbf23d
commit
96b3746643
@@ -0,0 +1,158 @@
|
||||
# A building contractor's needs, as a portal needs spec: a small to
|
||||
# mid-sized firm doing surveys, design and rehabilitation, run by a few
|
||||
# project managers with its own crew and a ring of subcontractors.
|
||||
#
|
||||
# This file is a target, not a description: there are no pages behind
|
||||
# it yet, so `question_lint` fails every need. The trainer's job is to
|
||||
# write the pages, aggregates.yaml and desks that turn it green, then
|
||||
# word them until the personas route right.
|
||||
#
|
||||
# Groups (Kanidm): project_managers, hse, crew, subcontractors.
|
||||
# Everyone else arrives anonymous.
|
||||
#
|
||||
# What the sector demands of the flows, and why the budgets are what
|
||||
# they are:
|
||||
# - Winning work is a pipeline, not an inbox: a lead is surveyed, then
|
||||
# quoted, then won or lost. "answered" is not an outcome.
|
||||
# - A subcontractor must be vetted before they set foot on site
|
||||
# (company registration, trade approval, insurance, tax standing,
|
||||
# site ID cards for their people). Documents go missing; the state
|
||||
# machine has to say so and let them come back.
|
||||
# - Deviation and near-miss reporting only works when it costs the
|
||||
# reporter seconds. Three required fields, one submission, from a
|
||||
# phone, and the safety officer owns closing it.
|
||||
# - People move between firms constantly; onboarding a worker is the
|
||||
# same shape as onboarding a subcontractor, one size smaller.
|
||||
needs:
|
||||
- id: win-survey-work
|
||||
who: a building owner or housing board with a problem in their building
|
||||
wants: someone qualified to look at it and say what it takes
|
||||
lands_in: leads
|
||||
handled_by: project_managers
|
||||
done_when: [won, lost]
|
||||
max_steps: 2
|
||||
max_fields: 5
|
||||
|
||||
- id: win-design-work
|
||||
who: an owner who knows what they want built or changed
|
||||
wants: drawings, a permit application, and a price
|
||||
lands_in: leads
|
||||
handled_by: project_managers
|
||||
done_when: [won, lost]
|
||||
max_steps: 2
|
||||
max_fields: 6
|
||||
|
||||
- id: vet-subcontractor
|
||||
who: a trade firm that wants to work for us
|
||||
wants: to be approved once, and then be asked
|
||||
lands_in: subcontractors
|
||||
handled_by: project_managers
|
||||
done_when: [approved, rejected]
|
||||
max_steps: 2
|
||||
max_fields: 7
|
||||
|
||||
- id: request-bids
|
||||
who: a project manager with a job to staff
|
||||
wants: approved subcontractors to see it and answer
|
||||
enters: /jobs/post
|
||||
enters_as: project_managers
|
||||
lands_in: job_requests
|
||||
handled_by: project_managers
|
||||
done_when: [awarded, withdrawn]
|
||||
max_steps: 1
|
||||
max_fields: 5
|
||||
|
||||
- id: answer-bid
|
||||
who: an approved subcontractor
|
||||
wants: to say yes to a job, with a price and a start date
|
||||
enters: /jobs
|
||||
enters_as: subcontractors
|
||||
lands_in: bids
|
||||
handled_by: project_managers
|
||||
done_when: [accepted, declined]
|
||||
max_steps: 2
|
||||
max_fields: 3
|
||||
|
||||
- id: hire-crew
|
||||
who: a tradesperson looking for work
|
||||
wants: to be considered, without writing a letter
|
||||
lands_in: applicants
|
||||
handled_by: project_managers
|
||||
done_when: [hired, declined]
|
||||
max_steps: 2
|
||||
max_fields: 4
|
||||
|
||||
- id: report-deviation
|
||||
who: anyone on site - crew or a subcontractor's people
|
||||
wants: to report a hazard, a near miss or a defect before they forget
|
||||
enters: /site
|
||||
enters_as: crew
|
||||
lands_in: deviations
|
||||
handled_by: hse
|
||||
done_when: [closed]
|
||||
max_steps: 1
|
||||
max_fields: 3
|
||||
|
||||
personas:
|
||||
- id: housing-board-damp
|
||||
need: win-survey-work
|
||||
text: >
|
||||
I chair the board of a housing cooperative from the seventies.
|
||||
Two ground-floor flats have damp in the walls and we don't know
|
||||
if it's drainage or the facade. We need someone to tell us.
|
||||
|
||||
- id: buyer-before-purchase
|
||||
need: win-survey-work
|
||||
text: >
|
||||
We are about to buy an old timber house. Before we sign we want
|
||||
a professional to go through it and tell us what is wrong with it.
|
||||
|
||||
- id: attic-conversion
|
||||
need: win-design-work
|
||||
text: >
|
||||
We want to turn our attic into two bedrooms and a bathroom. We
|
||||
need drawings and someone who handles the application to the
|
||||
municipality.
|
||||
|
||||
- id: shop-to-flat
|
||||
need: win-design-work
|
||||
text: >
|
||||
I own a former shop on the ground floor and want to make it a
|
||||
flat. I have no idea what is allowed. Can you sort that out and
|
||||
give me a price?
|
||||
|
||||
- id: electrician-firm
|
||||
need: vet-subcontractor
|
||||
text: >
|
||||
We are a four-person electrical firm, fully certified. We would
|
||||
like to get on your list so you call us when you need
|
||||
electricians.
|
||||
|
||||
- id: scaffolder
|
||||
need: vet-subcontractor
|
||||
text: >
|
||||
I run a scaffolding company. How do I get to do jobs for you?
|
||||
|
||||
- id: carpenter-jobseeker
|
||||
need: hire-crew
|
||||
text: >
|
||||
I'm a certified carpenter with eight years on rehabilitation
|
||||
jobs. Are you hiring?
|
||||
|
||||
- id: apprentice
|
||||
need: hire-crew
|
||||
text: >
|
||||
I finish vocational school this spring and need an
|
||||
apprenticeship as a bricklayer.
|
||||
|
||||
- id: loose-railing
|
||||
need: report-deviation
|
||||
text: >
|
||||
The railing on the third level of the scaffold on the north
|
||||
side is loose. Nobody got hurt but someone will.
|
||||
|
||||
- id: wrong-membrane
|
||||
need: report-deviation
|
||||
text: >
|
||||
The bathroom membrane delivered today is not the one in the
|
||||
specification. We stopped work on it.
|
||||
Reference in New Issue
Block a user