portal serve runs a site; portal lint is what iris was; portal plan, build, report and the rest are what portal-trainer was. One source at one version, so the three never disagree about what content means. Both histories are merged in (subtree). The release attaches the bare binary for a content repo's CI. The trainer's plans, intakes, engines and reference prompt come along; its runs stay in the old repo. Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01GT37Z1Xtfd9pUuQtMTg6Yt
This commit is contained in:
co-authored by
Claude Fable 5.1
parent
d0d1cbf23d
commit
96b3746643
@@ -0,0 +1,91 @@
|
||||
# A building authority's intake: the hardest sector the trainer has
|
||||
# been given. Cases that pause and resume, cases that belong to other
|
||||
# cases, a decision two roles sign, a deadline nobody in the building
|
||||
# controls, and an appeal that reopens something already finished.
|
||||
# Written the way the department head would write it, in plain words.
|
||||
business: Vestmark kommune - Building and Planning
|
||||
contact: { name: Solveig Hauge, email: byggesak@vestmark.example }
|
||||
language: en
|
||||
|
||||
what_we_do: >
|
||||
We are the building authority for a municipality of twenty-one
|
||||
thousand people. Anyone who wants to build, demolish, divide a
|
||||
property or change what a building is used for has to come to us
|
||||
first. We check the drawings against the zoning map and the building
|
||||
regulations, we let the neighbours and the other authorities have
|
||||
their say, and then we approve or refuse. We also decide exemptions
|
||||
from the zoning rules, we inspect what is actually built, we sign off
|
||||
finished work, and we deal with building that was never applied for.
|
||||
|
||||
who_comes_to_us: >
|
||||
Homeowners who want a garage, an extension or a new window, and who
|
||||
have never read a regulation in their life. Architects and
|
||||
engineering firms who file on behalf of owners; they have to be
|
||||
approved by us before they may file anything. Neighbours who got a
|
||||
notice in the post and do not agree with what is planned next door.
|
||||
The other authorities we are obliged to ask: the road authority, the
|
||||
fire service, the heritage office, the county. People who ring to say
|
||||
something is going up behind their fence without permission. And
|
||||
anyone who wants to sit down with us before they spend eighty
|
||||
thousand on drawings.
|
||||
|
||||
what_we_keep_track_of: >
|
||||
Pre-application meetings: someone asks for one, we find a time, we
|
||||
meet, and we write down what we told them so they can hold us to it.
|
||||
Applications: they arrive, someone checks whether the papers are all
|
||||
there, and if something is missing we write and ask for it, and the
|
||||
twelve-week clock stops until they answer. Often we have to ask
|
||||
twice. When it is complete we send it out to the neighbours and to
|
||||
the agencies and wait six weeks. Then a case officer writes a
|
||||
recommendation, and the head of section signs the decision: approved,
|
||||
approved with conditions, or refused. People can withdraw at any
|
||||
point, and quite a few do once they hear from the neighbours.
|
||||
Exemptions: if what someone wants breaks the zoning rules they can
|
||||
ask for an exemption. It rides along with the application but it is a
|
||||
decision of its own, and we are not allowed to grant one before the
|
||||
county has been asked.
|
||||
Objections: a neighbour who got a notice writes to us within the
|
||||
hearing period. Each objection belongs to an application. We register
|
||||
it, the applicant gets to answer it, and the case officer has to
|
||||
address every single one in the decision, by name.
|
||||
Hearing answers: we ask an agency, they answer, or they do not, and
|
||||
when the deadline has passed we go on without them.
|
||||
Appeals: for three weeks after a decision anyone with an interest can
|
||||
appeal it. We go through it ourselves first, and if we change our own
|
||||
mind that is the end of it. If we do not, it goes to the appeals
|
||||
board, who meet once a month and either uphold us or overturn us.
|
||||
Inspections: we pick cases and go and look, on site. Either it is as
|
||||
approved, or we write up what is wrong and set a date for it to be
|
||||
put right, and then we go back.
|
||||
Finishing: when the work is done the firm asks for a completion
|
||||
certificate. If they want to move in before everything is done they
|
||||
can ask for a temporary permission instead. We check what was
|
||||
inspected and what is still outstanding before we sign anything.
|
||||
Illegal building: someone reports it, we go and look, we write to the
|
||||
owner and they have to explain themselves, and then they either apply
|
||||
for it properly, take it down, or we fine them weekly until they do.
|
||||
Approved firms: a firm sends us their registration, their insurance
|
||||
and what they are qualified for, we check it, and then they are on
|
||||
the list and may file applications.
|
||||
|
||||
who_is_involved: >
|
||||
The front desk logs what comes in over the counter and on the phone,
|
||||
and keeps the archive. Four case officers carry the cases. The head
|
||||
of section signs every decision and every exemption; a case officer
|
||||
may not sign their own. Two inspectors are out on site most of the
|
||||
week and write up what they find on a phone in a cold wind. The
|
||||
appeals board is seven elected politicians who meet on the third
|
||||
Tuesday of the month and read what we send them. The agencies are
|
||||
outside the building altogether and only ever answer hearings. The
|
||||
approved firms file applications and answer objections on behalf of
|
||||
their clients.
|
||||
|
||||
what_slows_us_down: >
|
||||
The twelve-week clock, and the fact that stopping it and starting it
|
||||
again is done by hand in a spreadsheet. Applications that arrive
|
||||
missing half the drawings. Objections that come in on paper and get
|
||||
stapled to the wrong case. Neighbours ringing to ask what is
|
||||
happening with the case behind their house, which we are obliged to
|
||||
tell them and which takes ten minutes every time. Agencies that never
|
||||
answer at all. And nobody outside this building can see a case
|
||||
without asking us for it.
|
||||