# A building authority's intake: the hardest sector the trainer has
|
|||
|
|
# been given. Cases that pause and resume, cases that belong to other
|
||
|
|
# cases, a decision two roles sign, a deadline nobody in the building
|
||
|
|
# controls, and an appeal that reopens something already finished.
|
||
|
|
# Written the way the department head would write it, in plain words.
|
||
|
|
business: Vestmark kommune - Building and Planning
|
||
|
|
contact: { name: Solveig Hauge, email: byggesak@vestmark.example }
|
||
|
|
language: en
|
||
|
|
|
||
|
|
what_we_do: >
|
||
|
|
We are the building authority for a municipality of twenty-one
|
||
|
|
thousand people. Anyone who wants to build, demolish, divide a
|
||
|
|
property or change what a building is used for has to come to us
|
||
|
|
first. We check the drawings against the zoning map and the building
|
||
|
|
regulations, we let the neighbours and the other authorities have
|
||
|
|
their say, and then we approve or refuse. We also decide exemptions
|
||
|
|
from the zoning rules, we inspect what is actually built, we sign off
|
||
|
|
finished work, and we deal with building that was never applied for.
|
||
|
|
|
||
|
|
who_comes_to_us: >
|
||
|
|
Homeowners who want a garage, an extension or a new window, and who
|
||
|
|
have never read a regulation in their life. Architects and
|
||
|
|
engineering firms who file on behalf of owners; they have to be
|
||
|
|
approved by us before they may file anything. Neighbours who got a
|
||
|
|
notice in the post and do not agree with what is planned next door.
|
||
|
|
The other authorities we are obliged to ask: the road authority, the
|
||
|
|
fire service, the heritage office, the county. People who ring to say
|
||
|
|
something is going up behind their fence without permission. And
|
||
|
|
anyone who wants to sit down with us before they spend eighty
|
||
|
|
thousand on drawings.
|
||
|
|
|
||
|
|
what_we_keep_track_of: >
|
||
|
|
Pre-application meetings: someone asks for one, we find a time, we
|
||
|
|
meet, and we write down what we told them so they can hold us to it.
|
||
|
|
Applications: they arrive, someone checks whether the papers are all
|
||
|
|
there, and if something is missing we write and ask for it, and the
|
||
|
|
twelve-week clock stops until they answer. Often we have to ask
|
||
|
|
twice. When it is complete we send it out to the neighbours and to
|
||
|
|
the agencies and wait six weeks. Then a case officer writes a
|
||
|
|
recommendation, and the head of section signs the decision: approved,
|
||
|
|
approved with conditions, or refused. People can withdraw at any
|
||
|
|
point, and quite a few do once they hear from the neighbours.
|
||
|
|
Exemptions: if what someone wants breaks the zoning rules they can
|
||
|
|
ask for an exemption. It rides along with the application but it is a
|
||
|
|
decision of its own, and we are not allowed to grant one before the
|
||
|
|
county has been asked.
|
||
|
|
Objections: a neighbour who got a notice writes to us within the
|
||
|
|
hearing period. Each objection belongs to an application. We register
|
||
|
|
it, the applicant gets to answer it, and the case officer has to
|
||
|
|
address every single one in the decision, by name.
|
||
|
|
Hearing answers: we ask an agency, they answer, or they do not, and
|
||
|
|
when the deadline has passed we go on without them.
|
||
|
|
Appeals: for three weeks after a decision anyone with an interest can
|
||
|
|
appeal it. We go through it ourselves first, and if we change our own
|
||
|
|
mind that is the end of it. If we do not, it goes to the appeals
|
||
|
|
board, who meet once a month and either uphold us or overturn us.
|
||
|
|
Inspections: we pick cases and go and look, on site. Either it is as
|
||
|
|
approved, or we write up what is wrong and set a date for it to be
|
||
|
|
put right, and then we go back.
|
||
|
|
Finishing: when the work is done the firm asks for a completion
|
||
|
|
certificate. If they want to move in before everything is done they
|
||
|
|
can ask for a temporary permission instead. We check what was
|
||
|
|
inspected and what is still outstanding before we sign anything.
|
||
|
|
Illegal building: someone reports it, we go and look, we write to the
|
||
|
|
owner and they have to explain themselves, and then they either apply
|
||
|
|
for it properly, take it down, or we fine them weekly until they do.
|
||
|
|
Approved firms: a firm sends us their registration, their insurance
|
||
|
|
and what they are qualified for, we check it, and then they are on
|
||
|
|
the list and may file applications.
|
||
|
|
|
||
|
|
who_is_involved: >
|
||
|
|
The front desk logs what comes in over the counter and on the phone,
|
||
|
|
and keeps the archive. Four case officers carry the cases. The head
|
||
|
|
of section signs every decision and every exemption; a case officer
|
||
|
|
may not sign their own. Two inspectors are out on site most of the
|
||
|
|
week and write up what they find on a phone in a cold wind. The
|
||
|
|
appeals board is seven elected politicians who meet on the third
|
||
|
|
Tuesday of the month and read what we send them. The agencies are
|
||
|
|
outside the building altogether and only ever answer hearings. The
|
||
|
|
approved firms file applications and answer objections on behalf of
|
||
|
|
their clients.
|
||
|
|
|
||
|
|
what_slows_us_down: >
|
||
|
|
The twelve-week clock, and the fact that stopping it and starting it
|
||
|
|
again is done by hand in a spreadsheet. Applications that arrive
|
||
|
|
missing half the drawings. Objections that come in on paper and get
|
||
|
|
stapled to the wrong case. Neighbours ringing to ask what is
|
||
|
|
happening with the case behind their house, which we are obliged to
|
||
|
|
tell them and which takes ten minutes every time. Agencies that never
|
||
|
|
answer at all. And nobody outside this building can see a case
|
||
|
|
without asking us for it.
|